Three Story Parking Garage Rehabilitation – Construction

Frederick W. Smith International Airport

Future Project Name
Three Story Parking Garage Rehabilitation – Construction
PROJECT DESCRIPTION
This project is to rehabilitate the existing 3-Story Parking Garage (“Long/Short Term Garage”) at MEM Airport. Scope of rehabilitation is still to be determined.  More information to come as it is available.
ANTICIPATED TIMING
• Bidding*:  Late 2026/Early 2027
• Construction:  2027 to 2028
 
*Likely Design-Build delivery method
ANTICIPATED NAICS CODES
• 236220 Commercial and Institutional Building Construction
• 237110 Water and Sewer Line and Related Structures Construction
• 238210 Electrical Contractors and Other Wiring Installation Contractors
• 238220 Plumbing, Heating, and Air-Conditioning Contractors
• 238390 Other Building Finishing Contractors