Future Project Name |
---|
Charles W. Baker Pavement Rehabilitation – Phase 2 – Construction |
PROJECT DESCRIPTION This project will rehabilitate approximately 4,400 SY of existing apron pavement, construct approximately 800 SY of new apron pavement, and rehabilitate approximately 5,500 SY of existing parking lot pavement at Charles W. Baker Airport (2M8). General scope items are airfield paving, parking lot paving, demolition, full depth reclamation, concrete flatwork, electrical, pavement markings, grading, drainage, erosion control, and other efforts as needed. |
ANTICIPATED TIMING • Bidding: Early/Mid 2026 • Construction: Late 2026 |
ANTICIPATED NAICS CODES • 237110 Water and Sewer Line and Related Structures Construction • 237310 Highway, Street, and Bridge Construction • 238210 Electrical Contractors and Other Wiring Installation Contractors • 238910 Site Preparation Contractors |
DRAWINGS / EXHIBITS • Project Exhibit |