Future Project Name |
---|
Fuel Farm Interceptor Abandonment/Removal – Construction |
PROJECT DESCRIPTION This project is to abandon and remove an existing fuel farm interceptor at MEM Airport. The project includes removal of the interceptor and associated modifications to the existing drainage system to bypass the location. Work items include removal/demolition, storm drainage, earthwork, and sodding. |
ANTICIPATED TIMING • Bidding: January 2026 • Construction: March-May 2026 |
ANTICIPATED NAICS CODES • 237110 Water and Sewer Line and Related Structures Construction • 238910 Site Preparation Contractors |
DRAWINGS / EXHIBITS • Project Exhibit |