| Future Project Name |
|---|
| Snow Removal Equipment (SRE) Storage Building – Phase 2 (Building Package) – Construction |
| PROJECT DESCRIPTION This project is to construct a new storage building for the Airport’s snow removal equipment (SRE) at MEM airport. The initial building under this project is anticipated to be 16 to 20 bays at approximately 40,000 SF with future expansions/buildings possible. Phase 1 of the project is for the site improvements. This second phase if the equipment storage building. |
| ANTICIPATED TIMING • Bidding: May 2026 • Construction: Summer 2026 to Early 2027 |
| ANTICIPATED NAICS CODES • 236220 Commercial and Institutional Building Construction • 237110 Water and Sewer Line and Related Structures Construction • 238110 Poured Concrete Foundation and Structure Contractors • 238120 Structural Steel and Precast Concrete Contractors • 238160 Roofing Contractors • 238210 Electrical Contractors and Other Wiring Installation Contractors |
| DRAWINGS / EXHIBITS • Site Map |