MEM on the Move: Demolition of upper outer drive underway as lower level commercial lane opens
In the most visible show of terminal modernization yet, demolition of the upper outer drive began in mid-September to allow for construction of a new upper commercial drive. As the old drive started to come down, the new, lower-level commercial lane opened inside the three story garage to accommodate taxis, limos, ride-app users, and shuttles. Bright orange signage along every path and corridor help to direct passengers to the new commercial vehicle pick-up and drop-off lane.