
Memphis, TN (September 2, 2026) — Memphis Shelby County Airport Authority (MSCAA) today announced the official reopening of its Pedestrian B Tunnel at Frederick W. Smith International Airport (MEM), successfully completing a critical phase of the airport’s ongoing Terminal Modernization and Seismic Program (TMSP). Starting Wednesday, September 2, travelers can once again use the tunnel for direct access.
The tunnel closed in October 2025 to enhance the connection between parking and rental car facilities and to allow for structural enhancements related to the construction of a replacement elevated roadway at the Departures Level, an enabling phase of the Terminal Modernization construction. Currently, Pedestrian Tunnel B includes brighter LED lighting, higher ceilings, and expanded accessibility for travelers.
“We want to thank our passengers for their patience during the closure of the pedestrian tunnel,” said Terry Blue, MSCAA President and CEO. “This reopening marks a yet another milestone in our multi-year effort to transform the travel experience through the modernization of our iconic terminal buildings.”
Passengers are advised that while the primary walkway is fully operational, additional work will continue in preparation for continued enhanced accessibility and convenience.
To stay up to date, visit www.memonthemove.com or follow @flymemphis on social media.
